Construction of transmission pipe line 800mm and 600mm with total length 21 km, Scope of work include execution micro tunnelling works under Makkah-Riyadh road with total length 200m, Execution of concrete valve chambers for butterfly valves, Air valves, Washout air valves, Flow meter and asphalt works on main roads, Scope of work include construction of main pump station with capacity 2100 m3/hr, scope of work of main pump station include structure and electromechanical works for pump room, Transformer & generator room.