Execution of New Water Lines and the Transformation of Existing Lines to Connect the Breman Steel Tanks and the Main Water Lines (2 & 1) (GRC)

About Project

Installation of new ductile pipeline with 2000, 1600 ,1500, and 1400 mm diameter with a total length of 1800 m and diversion of existing lines to connect Breman Steel Tanks to the main water lines N 1 ,C 1 and C 2 complete with required butterfly air and washout valves, flow meter and Scada System

Client

National Water Company (NWC)

Project Value

SAR 64, 504, 245.00

Start and End date

FROM 4-Dec-19 to 3-Dec-20