Construction of transmission pipe line 1200 mm with total length 23 km to feed water to projects of the Diriyah gate development authority, scope of work include execution micro tunneling works under main road on Riyadh with total length 1400 m , execution of concrete valve chamber for butterfly valves , air valves, washout air valves ,flow meter and flow control valve with Scada system for all valves with connection to existing Scada system at TGNW tank location and asphalt works on main roads.